Greenwall Construct

Site material.
Sound barrier.

Greenwall Construct turns suitable recovered material into the engineered core of a planted acoustic barrier. Watch how the on-site recovery, electric crushing and installation process works.

30-second explainer

From site waste
to sound barrier.

Suitable construction material is recovered, processed and put back to work inside permanent acoustic infrastructure.

Greenwall Construct · 30-second process film · switch sound on for the full story.

42 dBSound insulation
12 dBSound absorption
Up to 8 mBarrier height
1.048–1.832 mIndicative base width at 1–8 m height

Choose the height. Check the footprint.

Indicative dimensions from the supplied Greenwall table. Heights are measured above ground level; fill volumes are per metre of barrier length.

Height (m)Top width (m)Base width (m)Fill volume (m³/m)Ground pressure (kN/m²)
10.801.0480.83627
20.801.1661.84248
30.801.2822.96972
40.801.3824.034101
50.801.4985.388124
60.801.6166.870147
70.801.7148.227169
80.801.8329.937193
These are guide values, not a project-specific design. Confirm ground conditions, fill specification and structural requirements with the technical team.
From site waste to sound barrier

Recover it. Process it. Put it to work.

Suitable site-won material can be crushed on site using electrically driven equipment powered by a renewable-charged battery system. The processed aggregate is tested and graded before use as fill in Greenwall Construct.

Less waste haulage Less diesel use
Material suitability and acoustic performance depend on testing, engineering specification and regulatory approval.Discuss your projectNeil · +44 7976 246 825
Five-stage illustration from recovered construction material to Greenwall Construct barrierView the full process graphic ↗