Early-stage project intelligence

Measure the impact.
Before you build.

Explore the potential carbon and biodiversity value of a Greenwall project. Adjust the assumptions, see the result instantly, then ask us to develop a verified project assessment.

CarbonSync estimateBNG scenarioBudget requestTransparent assumptions
01
CarbonSync planning estimate

Removal and avoidance

Estimate the potential benefit from on-site material recovery, avoided haulage, renewable electric crushing and long-term planted coverage.

Planning factors used

Freight: 0.10 kg CO₂e per tonne-km. Recovered-material processing and landfill displacement: 11.5 kg CO₂e per tonne. Grid electricity displaced by renewable BESS: 0.175 kg CO₂e per kWh. All factors are editable project assumptions and require technical validation.

Combined planning estimate13.8 tCO₂e

potential climate benefit across 30 years

Avoided9.3 t
Removed4.5 t
  • 1.5 t from avoided haulage
  • 3.5 t from material recovery
  • 4.4 t from renewable crushing
  • 300 m² planted barrier
Indicative feasibility estimate only. This is not a verified CarbonSync Unit, carbon credit, EPD or formal carbon account.
02
Biodiversity scenario

Explore potential net gain

Test a simple area-habitat scenario using the principal factors behind England’s statutory biodiversity metric.

Before development

Proposed habitat

Indicative net change+27.5%

This scenario reaches the 10% planning threshold.

Baseline0.4 units
Proposed0.51 units

10% target: 0.44 units

Early-stage scenario only. Mandatory BNG submissions must use the current statutory metric and may require a competent ecologist. Habitat trading rules and irreplaceable habitats are not assessed here.
03
Project budget request

Ask for an indicative budget

Send us the wall dimensions selected above. Greenwall UK will review the product, site and delivery requirements before discussing an indicative project budget.

Selected solutionGreenwall Construct300 m² barrier area
Request a project budgetGive us enough information to review the scope and contact you.
Project information prepared

A useful budget starts with the site—not a generic square-metre rate.

We will consider product selection, dimensions, ground conditions, acoustic requirements, access and programme before discussing an allowance.

Construct300 m²100 m long3 m high
Turn an estimate into an evidence pack

Bring us your site.
We’ll build the case.

Greenwall UK can develop the acoustic, circular-economy, carbon and biodiversity story around your project.

Request a technical reviewNeil · +44 7976 246 825